docs(forms): link Form A runtime evidence from P9-03 plan
This commit is contained in:
1 parent
63806f106c
commit
a635a5f55c
1 file changed
+2
@@ -4,6 +4,8 @@ Date: **2026-10-18** · Plan version **1.2 revision 2026-10-21** · Governing co
|
|||||||
|
|
||||||
**Planning only. Do not execute any batch from this document without separate authorization.** Phase 9 establishes decisions and bounded implementation authority. Phase 10 retains final production integration acceptance, rollback and cutover. The user stages, signs and pushes.
|
**Planning only. Do not execute any batch from this document without separate authorization.** Phase 9 establishes decisions and bounded implementation authority. Phase 10 retains final production integration acceptance, rollback and cutover. The user stages, signs and pushes.
|
||||||
|
|
||||||
|
> **Form A progress note — 2026-10-25 (supplemental implementation evidence, no release approval):** The owner authorized a new blank-built **AIA | Website | General Enquiries** form (`262946078314059`) and reports successful browser checks of contact vs. compact visibility, conditional email requiredness, and the added Spanish language. Its hidden presentation field must have **Advanced → Field Details → Unique Name = `formContext`** (exact case); using only that text as its visible label did not enable URL prepopulation. See [Form A Builder/runtime verification](phase-9-form-a-jotform-runtime-verification-2026-10-25.md) for evidence, limitations, future Forms B/C key verification, and open gates. This records a separately authorized owner/connector activity since the original planning snapshot: it **does not** approve a live embed or submissions, modify the Form B mapping for the four campaign pages, certify notifications/PHI handling, or close JF/OA acceptance. Forms B and C remain planned; their field keys and IDs must not be guessed. The existing uncommitted Jotform integration README/CSS belong to a separate Codex workstream and are not overwritten here.
|
||||||
|
|
||||||
## 1. Actual baseline and reconciliation
|
## 1. Actual baseline and reconciliation
|
||||||
|
|
||||||
Verified `faithful-astro-migration`, HEAD `59911eb929579af7bcd6c42de6476128dab62289`, clean tracked tree and empty index. Three October 17 untracked inventory artifacts exist, alongside the five exclusions and `.phase8-stage-paths.nul`. No unexpected implementation change was found. The prior 27-row owner worksheet remains blank; the current supplied connector summary is not silently written into it.
|
Verified `faithful-astro-migration`, HEAD `59911eb929579af7bcd6c42de6476128dab62289`, clean tracked tree and empty index. Three October 17 untracked inventory artifacts exist, alongside the five exclusions and `.phase8-stage-paths.nul`. No unexpected implementation change was found. The prior 27-row owner worksheet remains blank; the current supplied connector summary is not silently written into it.
|
||||||
|
|||||||
Reference in new issue
Block a user