chore(reports): archive superseded reconciliation evidence
This commit is contained in:
1 file changed
+26
-6
@@ -341,13 +341,33 @@ report evidence and structural diffs before checkpoint actions. Follow
|
|||||||
`AUTONOMOUS-CODEX.md`; do not repair identity/signing or bypass sandbox restrictions.
|
`AUTONOMOUS-CODEX.md`; do not repair identity/signing or bypass sandbox restrictions.
|
||||||
|
|
||||||
Do not read, modify, move, delete, stage or checksum root `merge-plan.md`.
|
Do not read, modify, move, delete, stage or checksum root `merge-plan.md`.
|
||||||
Preserve and exclude these four superseded reconciliation reports without
|
|
||||||
reading or modifying their contents:
|
|
||||||
|
|
||||||
- `www/reports/route-reconciliation-2026-10-11-offline.json`
|
### Reconciliation archive — 2026-10-28
|
||||||
- `www/reports/route-reconciliation-2026-10-12-offline.json`
|
|
||||||
- `www/reports/route-reconciliation-2026-10-13-offline.json`
|
The owner explicitly superseded the former local-preservation instruction for
|
||||||
- `www/reports/route-reconciliation-2026-10-13-offline-06-16-06-857Z.json`
|
the seven untracked reconciliation artifacts below. They were all confirmed
|
||||||
|
untracked and moved, without overwrite, to the local archive outside this Git
|
||||||
|
repository:
|
||||||
|
|
||||||
|
`/home/alice/projects/wrk/aia/local-archives/azinstitute4autism-route-reconciliation-2026-10-28`
|
||||||
|
|
||||||
|
- `route-reconciliation-2026-10-11-offline.json`
|
||||||
|
- `route-reconciliation-2026-10-12-offline.json`
|
||||||
|
- `route-reconciliation-2026-10-13-offline.json`
|
||||||
|
- `route-reconciliation-2026-10-13-offline-06-16-06-857Z.json`
|
||||||
|
- `route-reconciliation-2026-10-20-offline.json`
|
||||||
|
- `route-reconciliation-2026-10-20-offline-18-04-39-776Z.json`
|
||||||
|
- `route-reconciliation-2026-10-22-offline.json`
|
||||||
|
|
||||||
|
They remain excluded from Git because they are superseded intermediate or
|
||||||
|
local-only evidence. Filename-reference review found historical report links
|
||||||
|
only; no runtime, test, build or audit dependency. The tracked final evidence
|
||||||
|
remains `route-reconciliation-2026-10-20-offline-18-37-43-828Z.json` and
|
||||||
|
`route-reconciliation-2026-10-22-offline-05-10-47-827Z.json`. Historical
|
||||||
|
reports may retain filename references as their contemporaneous record; no
|
||||||
|
active dependency remains unresolved. The four October 11–13 files were moved
|
||||||
|
under this explicit authorization without parsing or checksumming their
|
||||||
|
contents.
|
||||||
|
|
||||||
Exclude root `merge-plan.md` and temporary `.phase8-stage-paths.nul` as well.
|
Exclude root `merge-plan.md` and temporary `.phase8-stage-paths.nul` as well.
|
||||||
The old `.phase7-stage-paths.nul` is absent; do not recreate it.
|
The old `.phase7-stage-paths.nul` is absent; do not recreate it.
|
||||||
|
|||||||
Reference in new issue
Block a user