30 KiB
AIA Astro Migration — Living Session Handoff
Last updated: October 30, 2026 (UTC)
Repository: AIAMarketing/azinstitute4autism.com
Working branch: faithful-astro-migration
Last accepted technical implementation: consolidated service drawers and employee-portal preview at e97f0ea9b475715a1ea58110a27cdf50a2b3cb19; the commit containing this handoff adds the focused completion/styling correction pass
Previous accepted checkpoint: P9-03 documentation, signed 537f9864a0a3d0806180cbeca909bf1d03200c6f
Implementation checkpoint: the commit containing this handoff update; obtain its actual SHA from Git history after the signed checkpoint is created.
Next milestone: continue Phase 9 owner decisions and authorized integration batches; then Phase 10 — Final QA/Cutover Readiness.
The landing-page migration is technically completed for checkpoint purposes. Editorial, accessibility, stakeholder and production-release approval remain separate. This handoff does not authorize deployment or integration activation.
Authority and checkpoint history
Read repository-root AGENTS.md, MIGRATION_BRIEF.md and AUTONOMOUS-CODEX.md,
then this handoff and the relevant migration summary.
Later Phase 6A ratification controls conflicting original recommendations.
-
Phase 5C Team:
34d5394b3ce765028a27b9cddd9952de3f09bfe7. -
Phase 6A proposal:
76a035424dc5245443476b168d8c91ea62eed27b. -
Phase 6B.1 search:
b20c253383440598c2d07bf6f852906ac00c42df. -
Phase 6B.2 pagination:
6f5ac3c0d233cee5fbbb62be79bc6909e6bec183. -
Phase 6B.3 author archives:
8646792d46a8a117ef617f5dd2582c2550b45d19. -
Phase 6B.4 URL/SEO:
8192ea71c47a7163b40a7fad144ebbd2523282d1. -
Phase 6B.5 multilingual navigation/RTL: the signed replacement checkpoint
a699d467f19fafbfdda5fce1ce6226baa6e5fc3c; do not use its superseded unsigned SHA. -
Phase 6C Library/multilingual parity: signed checkpoint
b5bc95bc2b8e36c58e8b4d8ab4b11391374a7883. -
Phase 7 multilingual reconciliation: signed checkpoint
8e64d322092b1fa6e0f648ddf26a665c80588198. -
Phase 8 visual/accessibility implementation: signed checkpoint
59911eb929579af7bcd6c42de6476128dab62289. -
P9-03 Jotform contract and complete owner inventory: signed checkpoint
537f9864a0a3d0806180cbeca909bf1d03200c6f. -
Phase 9 landing-page integration: the commit containing this handoff update; obtain its actual SHA from Git history. It does not resolve P9-01 through P9-10.
Phase 6B.5 visitor navigation remains independent of SEO hreflang. Published
locale destinations, explicit fallback notices, native language disclosure,
Arabic contact bidi isolation and the two-line shared address remain intact.
/ar remains unpublished with an explicit English-home fallback.
ContactObfuscation is unchanged; reversed no-JavaScript strings are intentional.
The earlier Phase 6B.5 manual acceptance does not cover subsequent Phase 6C work.
Completed Phase 6C technical sequence
- 6C: restored nine missing English articles and source-backed self-hosted media; derived English Library and author page 6 from the catalog.
- 6C.1: restored source-supported Halloween contextual links in English self-advocacy and AAC articles.
- 6C.2: reconciled three materially outdated English articles and current published Spanish school readiness; replaced the obsolete Arabic antecedent/consequence body with a complete translation; audited all 19 established translation relationships.
- 6C.3: reconciled featured-image alternatives, source-supported headings, truncated descriptions and supported modification dates; retained the new Arabic guide's intentional modification-date omission; localized three diagrams.
- 6C.4: reconciled contextual and external links, previous/next/related relationships, image links and fragments; added localized self-advocacy Halloween references while preserving the landing-page ownership gate.
- 6C.5: audited all 74 articles, corrected narrow structural/accessibility regressions, and verified metadata, links, FAQs, translation relationships, pagination, search and publication policies. Technical readiness has documented nontechnical release gates.
Detailed evidence and reviewer checklists are in the final acceptance report. The checkpoint manifest lists 148 implementation/evidence paths; that checkpoint included its handoff as path 149. Historical phase records retain their original context.
Completed Phase 7 technical sequence
- Recovered Spanish privacy policy with February 19, 2025 revision date, localized metadata and reciprocal English/Spanish policy navigation.
- Localized actual Spanish form labels, options, instructions, disabled notices and Contact map text using explicitly passed publication locale; no backend enabled.
- Translated the Spanish reinforcement tip without changing article identity, dates or surrounding content; fluent/clinical approval remains pending.
- Localized Spanish/Arabic author headings and isolated Arabic BCBA/LBA text; biographies, identities and archive SEO unchanged.
- Prepared the nonproduction verification plan and Phase 9 decision register. P9-01 through P9-10 all remain Pending decision.
See the Phase 7 reconciliation report and checkpoint manifest. The non-Library matrix excludes all three Library-root content records: 20 EN / 8 ES / 1 unpublished AR draft → 20 EN / 9 ES / 1 unpublished AR draft; 28 → 29 eligible pages and 8 → 9 English–Spanish pairs. The final matrix has 30 records including the draft. Whole pages-collection counts (including roots) are 21/9/2 → 21/10/2, with 9 → 10 English–Spanish pairs. Do not mix populations.
Completed Phase 8 technical sequence
- Static checks and guarded Chromium smoke covered all 122 generated routes. The original browser pass captured 50 desktop/50 mobile full pages, checked 50 routes without JavaScript, and passed 40 focused interactions, with one native-dialog review finding subsequently compared against a native control.
- Corrected prose/FAQ/contact/form link contrast and underlines, navigation, language-menu, skip-link, byline and diagram focus treatments; fixed the scoped homepage director-grid overflow at 320px.
- Localized Arabic article controls and bidi counts without changing the API script. Corrected DTT/NET peer sections and consultation heading semantics while preserving text, fragments and appearance. Native dialogs remain intact; Chromium's browser-chrome boundary did not establish application focus escape.
- Corrected Phase 7 carryovers: Spanish HSA/FSA section after ESA/before financial help, Spanish alternative text and APROBADO artwork; Spanish privacy's missing information-collection H2 (eleven sections/four items), with no legal-text change. The final Spanish badge preserves the original alpha and every pixel outside its lettering rectangle; the English artwork is unchanged.
- Replaced flattened Tour Markdown with one MDX publication, structured nine-photo data and accessible carousel: captions, thumbnails, wraparound, keyboard/focus, restrained announcements, no auto-rotation, full no-JavaScript fallback and restored consultation link. No new dependency or production integration.
- Bounded follow-up: 30 grouped Chromium checks. Consolidated pass: 21 grouped checks, two contrast/reduced-motion probes, five distinct routes, 20 full-page captures, native 200% zoom on Tour/privacy (26 overlapping frames), four crops. Earlier follow-up also tested seven routes at native 200% zoom. Badge correction: eight EN/ES checks/crops at 320/390/768/1440px. These are distinct evidence populations, not additional unique-site-route totals.
- Loopback-only contexts allowed only local GET/HEAD, blocked external traffic, WebSockets and website service workers. Map-resource attempts and a synthetic fixture POST were prevented; no production API/like/form/conversion request was transmitted. Disabled controls/noindex remain insufficient API isolation.
See consolidated findings, browser results, badge correction evidence, and the Phase 8 checkpoint manifest and validation. Historical failed browser attempts remain recorded. System Playwright 1.61.0 / Chromium 151.0.7922.75 now work; the optional Nix browser-shell realization is not independently verified. No real screen-reader session or owner sign-off occurred.
Tour's public source passed normal TLS but was cache-qualified. Spanish privacy's capture used a certificate-insecure fallback after validation failed. Neither establishes current origin freshness; Spanish policy additionally requires a trusted-source comparison. No insecure retrieval was repeated.
Completed Phase 9 landing-page integration
- Imported four independently styled campaign routes from the sibling landing-page
repository:
/lp/aba-therapy,/lp/aba-insurance,/lp/aba-ahcccsand/lp/aba-private-pay. Their local fonts, images, components, metadata and source noindex policy are isolated from ordinary site pages. - Migrated the branded public
/lp/early-interventionroute with its compact header/footer, source section order, existing byte-identical local imagery and cache-qualified source evidence. It is self-canonical and adds one sitemap URL. - Omitted the sibling project's API, tracking, success-state and attribution runtime. Normal staging and indexing artifacts keep all five lead panels inactive, with no native POST, live Jotform or conversion behavior. The later seven-route Form A isolated-test adapter is separately gated and remains outside those artifacts. P9-01, P9-03, P9-05 and P9-07 remain open.
- Added
/lpas a temporary staging/testing index linking the five pages. It is alwaysnoindex,nofollow, sitemap/hreflang-excluded and omitted entirely whenPUBLIC_ALLOW_INDEXING=true. This build gate is not access control. - Detailed evidence is in the integration report, sanitized evidence JSON, early-intervention source record and final offline reconciliation. Earlier October 20 reconciliations remain superseded local evidence outside the checkpoint.
Current two-form status — 2026-10-29
- Form A (
262946078314059) has a frozen seven-route production-eligible allowlist:/contact,/es/contact, the four campaign landing routes and/lp/early-intervention. The five landing journeys use fixedformContext=landing&language=en. The owner has retired physical Form B. The owner reports Form Aconsultationis configured, and the repository now has a separate nine-route, non-indexing isolated-test allowlist:/client-consultation,/es/client-consultation,/schedule-consultation, the three English service drawers and the three matching Spanish service drawers. Those routes requirePUBLIC_AIA_FORMS_CONSULTATION_TEST_APPROVED=truein addition to every isolated-test gate and are never production-authorized by the seven-route resolver. Form C remains a separate future professional-referral form. See the two-form integration specification. - Owner-confirmed direct-Jotform evidence covers synthetic EN/ES submission, native thank-you, conditional email/language, generic no-answer/no-PDF staff notification, autoresponder delivery, corrected fixed Reply-To, no webhooks/integrations, privacy scope, recipient access and retention. The owner also reports successful Astro-iframe synthetic submission and confirmation on English contact, Spanish contact and one ABA landing placement; record the exact third route before release. Functional submission acceptance is complete only for those owner-reported samples. All-seven-route accessibility, runtime-network/telemetry, deployment and site-release acceptance remain open.
- The adapter retains fixed URLs, responsive fixed heights,
no-referrer,allow-forms allow-scripts allow-same-origin, no helper script, and a hosted fallback that is hidden without space until a 15-second missing-load timeout. A frame load only clears that timeout; it does not prove cross-origin application health or accepted submission. The official Jotform resizing handler is conditionally acceptable pending separately authorized source, origin, privilege, Firefox and error-state verification; it is not implemented. Fixed heights remain current. - A separate local production gate is prepared for Form A only. It requires
PUBLIC_AIA_FORMS_MODE=live,PUBLIC_AIA_FORMS_LIVE_APPROVED=true,PUBLIC_AIA_FORMS_ENVIRONMENT=productionandPUBLIC_AIA_FORM_A_PRODUCTION_APPROVED=true; the fixed seven-route allowlist remains enforced.PUBLIC_ALLOW_INDEXING=truepermits an indexing-enabled release artifact but never authorizes a form. Normal/off/mock behavior remains fail-closed. The isolated consultation surfaces require an explicit user action before a service-drawer iframe gets asrc; they retain no-referrer, minimal sandbox, fixed dimensions and the conditional hosted fallback. Form C, analytics and API forwarding remain inactive. Marketing-only notification routing is a pre-cutover operational check. Rolling back Form A means rebuilding with modeoffor an absent approval value and switching only the static artifact; it does not alter Jotform.
The indexing-enabled build has 127 HTML routes/canonicals and 109 sitemap URLs.
Normal staging has 128 noindex,nofollow pages because it also contains /lp;
its sitemap and hreflang are empty. Existing 180 hreflang links across 55 routes,
25 translation sets, 74 Library articles, nine author archives and nine redirect
definitions are unchanged. Guarded Chromium covered the four campaign routes at
320/390/768/1440px, the branded route at those widths plus no-JavaScript checks,
and /lp at 320/1440px. Real screen-reader, non-Chromium and authorized visual,
clinical, privacy and organizational acceptance remain pending.
Verified technical baseline
| Metric | Result |
|---|---|
| Library articles / locale search records | 55 EN / 12 ES / 7 AR = 74 |
| Indexing-enabled HTML routes / unique canonical targets | 127 / 127 |
Normal staging HTML routes, including temporary /lp |
128 |
| Author archive routes | 9 |
| Indexing-enabled sitemap URLs | 109 |
| Hreflang links / participating routes | 180 / 55 |
| Validated page/article translation sets | 25 |
| Repository redirect definitions | 9, not activated on deployed hosts |
| Visible/schema-aligned FAQ answers / articles | 182 / 30 |
English Library and author pagination is 10/10/10/10/10/5; Spanish is 10/2,
Arabic is one seven-article root. Page 6 is derived, with no page 7 or page-one
HTML alias. Search remains locale-scoped, metadata-only and demand-loaded.
Publication ordering uses original dates, not modification dates. Existing
syndicated external-canonical/noindex exceptions remain unchanged.
Normal staging output is 128 noindex,nofollow HTML pages, an empty sitemap
and no hreflang. Indexing-enabled validation is local only. No deployment,
redirect activation, form submission or production integration is authorized.
Final source-matching offline evidence is the October 20 reconciliation: 138 dispositions, 128 local generated routes, 70 reused historical production requests and schema 2. Use this explicit evidence path for read-only checks. Earlier Phase 8 and October 20 reports remain historical evidence, not the current source fingerprint. No fresh production crawl was performed.
The historical Phase 6C.5 parity classifications were 10 confirmed, 58 with accepted intentional deviations, one minor discrepancy, five requiring human review, zero material discrepancies and zero insufficient-verification records against the selected evidence. Findings rely on dated, sometimes cached/prerendered public HubSpot representations; they do not establish independent current origin freshness. The newer Arabic antecedent/consequence translation intentionally supersedes its outdated public Arabic body. Machine-assisted work is not professional approval.
Phase 8 checkpoint preparation revalidation on October 15 passed sequentially
with TMPDIR=/tmp: Astro check (101 files, zero diagnostics), Markdown 20,
publication 33, SEO 35, Library 53, routes 10 and Phase 8 5 tests: 156 total.
Both build modes and link/image/blog audits pass. The final normal staging build
and explicit offline consistency check retain the publication safeguards above.
Git identity/signing remains the user’s host-terminal responsibility.
Outstanding Stakeholder Review and Production Release Gates
- Clinical/organizational — AIA: approve eligibility and program-specific ranges against general ABA eligibility of 18 months through eight years; resolve the summer-routine age discrepancy. Review Preparatory Academy ages 2–6 and 1:2 delivery ratio, ABA versus education, Arizona educational guidance, functional assessment, behavior intervention, reinforcement, extinction, aggression, self-injury, safety, treatment/outcome claims and author roles, credentials and biographies, including Arabic physician-like wording versus English “clinician.” Source publication alone is not clinical approval.
- Fluent Spanish/Arabic and clinical review: revised Spanish school readiness, rewritten Arabic antecedent/consequence guidance and terminology, all three localized Arabic diagrams, localized self-advocacy Halloween additions, operational labels and cross-language notices remain pending.
- Spanish tip review: Phase 7 corrected the English tip at
/es/library/positive-reinforcement-techniques. Its fluent-Spanish and clinical/editorial acceptance remains open; historical Phase 6C findings remain intact. - Privacy/legal and trusted-source approval — P9-07: both policy claims need AIA privacy/legal approval. Spanish privacy was recovered from a cache-qualified response after standard TLS certificate validation failed; fallback disabled certificate verification. Matching captured text does not prove authenticated origin fidelity. Before production, compare against a certificate-validated source or owner-supplied authoritative export with provenance; no trusted comparison is available yet. Fluent Spanish approval remains mandatory. Do not repeat insecure retrieval or rewrite policies to hide this limitation.
- Browser/accessibility: guarded Chromium automation now covers desktop/mobile, keyboard, no-JavaScript, RTL/diagram scrolling and actual 200% zoom. Authorized visual/source-fidelity acceptance, non-Chromium coverage, native-dialog AT behavior, Arabic visual-language acceptance and real screen-reader testing remain pending. Earlier failed attempts remain historical; browser automation and DOM inspection do not constitute reviewer or assistive-technology approval.
- Spanish HSA/FSA financial claims: fluent-Spanish and organizational/financial review of wording, account use, pre-tax and tuition claims remains pending. Localized artwork is not financial eligibility or reimbursement approval.
- Landing-page integration — Phase 9 owner gate: presentation for the four
campaign routes and
/lp/early-interventionis now imported under explicit owner authorization. The Library CTA remains provisionally/client-consultation; its equivalence to/lp/early-intervention, campaign routing, redirects and live form behavior are not approved. Do not activate submissions or production redirects without separate authorization. - Employee portal — P9-02: staff/management access separation, authentication, authorization and employee/clinical data security remain unresolved; current metadata-only route is not a completed portal. See the portal brief.
- Likes/views API — P9-04: the uncommitted local implementation now defaults
to explicit fail-closed
off, with deterministic localmockbehavior and no live adapter. A future live adapter still requires separate API-origin, credential, cookie, consent and production-approval evidence. - Author SEO: keep archives self-canonical,
noindex,followin indexing-enabled builds, sitemap-excluded and hreflang-excluded. Changes require explicit approval. - Forms/privacy/analytics/advertising: approve form destinations and submission APIs, HIPAA/privacy safeguards, consent/analytics, Google Ads conversion tracking and each production integration's activation. No new PHI flow is authorized.
- Hosting/release: separately verify Contabo/NixOS deployment assumptions, HTTPS, canonical host, slashless URLs, query preservation, redirect targets and loops, real 404 responses, asset delivery, sitemap/robots, reproducible deployment, rollback and organizational release approval. The temporary Docker/nginx trailing-slash HTTPS-to-HTTP-to-HTTPS chain remains explicitly deferred. Static-build success does not verify these deployed behaviors.
Uncommitted extended Phase 10 technical QA — 2026-10-22
The signed baseline remains e874b26bb9dc24beb6bce2e83a10e7800e7e12b9 on
faithful-astro-migration; this section records uncommitted verification and
must not be treated as an accepted checkpoint. The local Phase 9 batches for
counter isolation, off/mock form infrastructure and Contabo release planning
were revalidated. Two bounded responsive defects were corrected: mobile
PageHero headings now fit their available width, and the Library two-column
grid allows its primary track to shrink at tablet width.
The final guarded Chromium pass opened 128/128 staging routes. The responsive
matrix passed 110/110 checks across 22 routes at 320/390/768/1024/1440px.
Four Leaflet GET requests were intercepted before transmission; no production
API, Jotform, Contabo form, analytics, advertising or WebSocket request was
transmitted. The normal staging artifact has 128 noindex,nofollow pages, an
empty sitemap and zero hreflang; the indexing artifact has 127 pages, 109
sitemap URLs and 180 hreflang links, with the temporary /lp review index
excluded.
New local verification tools and reports are described in the Phase 10 audit, browser, release-rehearsal and technical-readiness reports. A loopback Node release rehearsal passed atomic switch and rollback. nginx, Contabo topology, real screen-reader, non-Chromium, fluent-language, clinical, privacy/legal and all P9 owner decisions remain pending. No checkpoint SHA is assigned to this uncommitted work; the next signed SHA must come from the user's Git history.
Next: Phase 9 — Human-Decision Gates
Begin from the commit containing this handoff update; obtain its actual SHA from Git history and verify branch, history and working tree. Review P9-01 through P9-10 and gather evidence/owner decisions before proposing bounded implementation: landing-page ownership; portal security/access; forms/APIs; likes/views isolation; analytics/consent/Ads; clinical/organizational claims; policy/legal/provenance; author SEO; hosting/rollback; production authorization. All ten remain Pending decision. Do not infer approval from a technically feasible option or this checkpoint.
Use the nonproduction plan and reviewer procedure for remaining human acceptance. No hosted preview before approved fail-closed integration isolation. Phase 10 retains final QA, deployed routing/integration tests, rollback rehearsal and cutover readiness. Neither phase is authorized for live changes by this handoff. The user separately authorizes each implementation scope.
Working protocol and protected local files
Preserve the Markdown-first manifest-driven architecture, explicit translation
relationships and ratified publication policies. Implement only authorized scope;
report evidence and structural diffs before checkpoint actions. Follow
AUTONOMOUS-CODEX.md; do not repair identity/signing or bypass sandbox restrictions.
Do not read, modify, move, delete, stage or checksum root merge-plan.md.
Reconciliation archive — 2026-10-28
The owner explicitly superseded the former local-preservation instruction for the seven untracked reconciliation artifacts below. They were all confirmed untracked and moved, without overwrite, to the local archive outside this Git repository:
/home/alice/projects/wrk/aia/local-archives/azinstitute4autism-route-reconciliation-2026-10-28
route-reconciliation-2026-10-11-offline.jsonroute-reconciliation-2026-10-12-offline.jsonroute-reconciliation-2026-10-13-offline.jsonroute-reconciliation-2026-10-13-offline-06-16-06-857Z.jsonroute-reconciliation-2026-10-20-offline.jsonroute-reconciliation-2026-10-20-offline-18-04-39-776Z.jsonroute-reconciliation-2026-10-22-offline.json
They remain excluded from Git because they are superseded intermediate or
local-only evidence. Filename-reference review found historical report links
only; no runtime, test, build or audit dependency. The tracked final evidence
remains route-reconciliation-2026-10-20-offline-18-37-43-828Z.json and
route-reconciliation-2026-10-22-offline-05-10-47-827Z.json. Historical
reports may retain filename references as their contemporaneous record; no
active dependency remains unresolved. The four October 11–13 files were moved
under this explicit authorization without parsing or checksumming their
contents.
Exclude root merge-plan.md and temporary .phase8-stage-paths.nul as well.
The old .phase7-stage-paths.nul is absent; do not recreate it.
The staging aid is for the user's host terminal only; never stage it or use a
broad Git add. The actual future checkpoint SHA comes from Git after the user
signs; do not amend merely to insert it here.
Consolidated service drawers and portal checkpoint, 2026-10-30
This section supersedes earlier explicit-only drawer behavior. The checkpoint
containing this update adds four-second/50%-scroll consultation opening, one
shared 30-day localStorage expiry preference, manual override through the six
existing EN/ES service CTAs, and typed bilingual service introductions. The
Academy configuration is prepared without a new page. The fixed seven production
and separate nine consultation-test route lists remain unchanged. Consultation
indexing approval must explicitly be false.
The employee route now has a locked, local-decryption UI and a private owner-run
collection/rewrite utility. Real passphrases were unavailable: real portal
content/resource inventory and collection remain blocked pending the owner-run
step. Do not claim approximately 43 resources as a measured inventory. Do not
commit the original source, ciphertext, decrypted views or private resources.
www/private/employee-portal/ is ignored and outside Astro public output.
The accepted Jotform CSS backup and reconciliation archives are unchanged.
SOPS/age/sops-nix preparation is inactive, with no generated production identity, recipient, deployed module or server-access activation. Portal browser encryption remains access friction; internal resources require separate server-enforced staff/management authorization. See consolidated implementation and validation and owner utility instructions. The actual checkpoint SHA is the commit containing this section; obtain it from Git history. No push, deployment or cutover is authorized by this work.
Focused completion, portal styling and Spanish diagnostic — 2026-10-30
Authorized consultation drawers now accept only the documented
submission-completed / formID envelope from their activated iframe window
at the exact configured Jotform origin while the drawer is open. Object and
bounded JSON-string envelopes are supported; other actions/messages are ignored.
Completion writes the existing global 30-day expiry immediately, reveals EN/ES
acknowledgment, then starts slide-out after five seconds. Manual dismissal or
navigation cancels the countdown. Duplicate completion cannot restart it.
The next deliberate opening replaces the completed iframe; incomplete forms
remain intact across ordinary close/reopen. Load remains fallback-only, never
submission evidence. Real provider-message acceptance requires one owner-run
synthetic submission; automated tests use intercepted local fixtures only.
Portal presentation now restores scoped blue headings, spacing, directories, orange report buttons and accessible contact accents without retaining arbitrary classes, styles or scripts. Two synthetic encrypted views are verified. Private source exposed no plaintext class/CSS semantics, and real view codes were not available; exact legacy button recognition and visual parity require owner review. No private content/resource or ciphertext was added to Git or public output.
The reported seven-option Spanish consultation dropdown is an unresolved
Jotform configuration issue: generated EN/ES URLs have identical form ID and
formContext=consultation, differing only in language. Astro neither supplies
nor edits child dropdown options. Owner should compare the direct hosted Spanish
form and review multilingual option translations/Update Options conditions.
No account changes or real submissions were performed. Seven production and
nine isolated-test placements remain unchanged; production consultation, portal
cutover and site cutover remain unauthorized. See the
focused correction evidence.