Files
aia-website/www/reports/SESSION_HANDOFF.md
T

14 KiB
Raw Blame History

AIA Astro Migration — Living Session Handoff

Last updated: October 14, 2026 (UTC) Repository: AIAMarketing/azinstitute4autism.com Working branch: faithful-astro-migration Last accepted technical implementation: Phase 7 — Multilingual Reconciliation Previous accepted checkpoint: Phase 6C, signed b5bc95bc2b8e36c58e8b4d8ab4b11391374a7883 Implementation checkpoint: the commit containing this handoff update; obtain its actual SHA from Git history after the user creates the signed commit. Next milestone: Phase 8 — Visual and Accessibility Acceptance; then Phase 9 Human-Decision Gates and Phase 10 Final QA/Cutover Readiness.

Phase 7 is technically accepted for checkpoint preparation. Editorial, accessibility, stakeholder and production-release approval remain separate. The user stages, signs and pushes from the host terminal; this handoff does not authorize deployment or integration activation.

Authority and checkpoint history

Read repository-root AGENTS.md, MIGRATION_BRIEF.md and AUTONOMOUS-CODEX.md, then this handoff and the relevant migration summary. Later Phase 6A ratification controls conflicting original recommendations.

  • Phase 5C Team: 34d5394b3ce765028a27b9cddd9952de3f09bfe7.

  • Phase 6A proposal: 76a035424dc5245443476b168d8c91ea62eed27b.

  • Phase 6B.1 search: b20c253383440598c2d07bf6f852906ac00c42df.

  • Phase 6B.2 pagination: 6f5ac3c0d233cee5fbbb62be79bc6909e6bec183.

  • Phase 6B.3 author archives: 8646792d46a8a117ef617f5dd2582c2550b45d19.

  • Phase 6B.4 URL/SEO: 8192ea71c47a7163b40a7fad144ebbd2523282d1.

  • Phase 6B.5 multilingual navigation/RTL: the signed replacement checkpoint a699d467f19fafbfdda5fce1ce6226baa6e5fc3c; do not use its superseded unsigned SHA.

  • Phase 6C Library/multilingual parity: signed checkpoint b5bc95bc2b8e36c58e8b4d8ab4b11391374a7883.

Phase 6B.5 visitor navigation remains independent of SEO hreflang. Published locale destinations, explicit fallback notices, native language disclosure, Arabic contact bidi isolation and the two-line shared address remain intact. /ar remains unpublished with an explicit English-home fallback. ContactObfuscation is unchanged; reversed no-JavaScript strings are intentional. The earlier Phase 6B.5 manual acceptance does not cover subsequent Phase 6C work.

Completed Phase 6C technical sequence

  • 6C: restored nine missing English articles and source-backed self-hosted media; derived English Library and author page 6 from the catalog.
  • 6C.1: restored source-supported Halloween contextual links in English self-advocacy and AAC articles.
  • 6C.2: reconciled three materially outdated English articles and current published Spanish school readiness; replaced the obsolete Arabic antecedent/consequence body with a complete translation; audited all 19 established translation relationships.
  • 6C.3: reconciled featured-image alternatives, source-supported headings, truncated descriptions and supported modification dates; retained the new Arabic guide's intentional modification-date omission; localized three diagrams.
  • 6C.4: reconciled contextual and external links, previous/next/related relationships, image links and fragments; added localized self-advocacy Halloween references while preserving the landing-page ownership gate.
  • 6C.5: audited all 74 articles, corrected narrow structural/accessibility regressions, and verified metadata, links, FAQs, translation relationships, pagination, search and publication policies. Technical readiness has documented nontechnical release gates.

Detailed evidence and reviewer checklists are in the final acceptance report. The checkpoint manifest lists 148 implementation/evidence paths; that checkpoint included its handoff as path 149. Historical phase records retain their original context.

Completed Phase 7 technical sequence

  • Recovered Spanish privacy policy with February 19, 2025 revision date, localized metadata and reciprocal English/Spanish policy navigation.
  • Localized actual Spanish form labels, options, instructions, disabled notices and Contact map text using explicitly passed publication locale; no backend enabled.
  • Translated the Spanish reinforcement tip without changing article identity, dates or surrounding content; fluent/clinical approval remains pending.
  • Localized Spanish/Arabic author headings and isolated Arabic BCBA/LBA text; biographies, identities and archive SEO unchanged.
  • Prepared the nonproduction verification plan and Phase 9 decision register. P9-01 through P9-10 all remain Pending decision.

See the Phase 7 reconciliation report and checkpoint manifest. The non-Library matrix excludes all three Library-root content records: 20 EN / 8 ES / 1 unpublished AR draft → 20 EN / 9 ES / 1 unpublished AR draft; 28 → 29 eligible pages and 8 → 9 English–Spanish pairs. The final matrix has 30 records including the draft. Whole pages-collection counts (including roots) are 21/9/2 → 21/10/2, with 9 → 10 English–Spanish pairs. Do not mix populations.

Verified technical baseline

Metric Result
Library articles / locale search records 55 EN / 12 ES / 7 AR = 74
Generated HTML routes / unique canonical targets 122 / 122
Author archive routes 9
Indexing-enabled sitemap URLs 108
Hreflang links / participating routes 180 / 55
Validated page/article translation sets 25
Repository redirect definitions 9, not activated on deployed hosts
Visible/schema-aligned FAQ answers / articles 182 / 30

English Library and author pagination is 10/10/10/10/10/5; Spanish is 10/2, Arabic is one seven-article root. Page 6 is derived, with no page 7 or page-one HTML alias. Search remains locale-scoped, metadata-only and demand-loaded. Publication ordering uses original dates, not modification dates. Existing syndicated external-canonical/noindex exceptions remain unchanged.

Normal staging output is 122 noindex,nofollow HTML pages, an empty sitemap and no hreflang. Indexing-enabled validation is local only. No deployment, redirect activation, form submission or production integration is authorized.

Final source-matching offline evidence is the Phase 7 reconciliation: 133 dispositions, 70 historical production requests, schema 2. Its source fingerprint is 59753ffefd162f9110e05acea73e20147a7fc8286af132ea7b8e1748de180901. Use the explicit evidence path for read-only checks; do not select an excluded intermediate automatically or recrawl production to refresh a timestamp.

The historical Phase 6C.5 parity classifications were 10 confirmed, 58 with accepted intentional deviations, one minor discrepancy, five requiring human review, zero material discrepancies and zero insufficient-verification records against the selected evidence. Findings rely on dated, sometimes cached/prerendered public HubSpot representations; they do not establish independent current origin freshness. The newer Arabic antecedent/consequence translation intentionally supersedes its outdated public Arabic body. Machine-assisted work is not professional approval.

Phase 7 checkpoint preparation revalidation on October 14 passed sequentially with TMPDIR=/tmp: Astro check (92 files, zero diagnostics), Markdown 20, publication 33, SEO 35, Library 49 and route 10 tests; both build modes; link/image/blog audits with zero failures; explicit offline consistency check; and git diff --check. The last build restores normal staging safeguards. Git identity/signing remains the user’s host-terminal responsibility.

Outstanding Stakeholder Review and Production Release Gates

  • Clinical/organizational — AIA: approve eligibility and program-specific ranges against general ABA eligibility of 18 months through eight years; resolve the summer-routine age discrepancy. Review Preparatory Academy ages 2–6 and 1:2 delivery ratio, ABA versus education, Arizona educational guidance, functional assessment, behavior intervention, reinforcement, extinction, aggression, self-injury, safety, treatment/outcome claims and author roles, credentials and biographies, including Arabic physician-like wording versus English “clinician.” Source publication alone is not clinical approval.
  • Fluent Spanish/Arabic and clinical review: revised Spanish school readiness, rewritten Arabic antecedent/consequence guidance and terminology, all three localized Arabic diagrams, localized self-advocacy Halloween additions, operational labels and cross-language notices remain pending.
  • Spanish tip review: Phase 7 corrected the English tip at /es/library/positive-reinforcement-techniques. Its fluent-Spanish and clinical/editorial acceptance remains open; historical Phase 6C findings remain intact.
  • Privacy/legal and trusted-source approval — P9-07: both policy claims need AIA privacy/legal approval. Spanish privacy was recovered from a cache-qualified response after standard TLS certificate validation failed; fallback disabled certificate verification. Matching captured text does not prove authenticated origin fidelity. Before production, compare against a certificate-validated source or owner-supplied authoritative export with provenance; no trusted comparison is available yet. Fluent Spanish approval remains mandatory. Do not repeat insecure retrieval or rewrite policies to hide this limitation.
  • Browser/accessibility: desktop and approximately 390px mobile, keyboard focus, JavaScript-disabled browsing, RTL reading order and diagram scrolling, Arabic visual-language acceptance and a real screen-reader session remain required. Autonomous browser attempts failed. SVG raster inspection and generated HTML checks do not constitute browser or assistive-technology acceptance.
  • Landing-page ownership — Phase 9 owner gate: the public /lp/early-intervention CTA from /library/how-many-hours-aba-child-need is provisionally /client-consultation locally. These are not approved equivalents. Do not import the separate landing-pages repository, create a redirect or activate a form without explicit authorization.
  • Employee portal — P9-02: staff/management access separation, authentication, authorization and employee/clinical data security remain unresolved; current metadata-only route is not a completed portal. See the portal brief.
  • Likes/views API — P9-04: production fallback outside localhost includes credentialed stats requests and interaction writes. Empty configuration/noindex do not isolate it. Hosted review requires separately authorized fail-closed isolation and evidence of zero production API traffic.
  • Author SEO: keep archives self-canonical, noindex,follow in indexing-enabled builds, sitemap-excluded and hreflang-excluded. Changes require explicit approval.
  • Forms/privacy/analytics/advertising: approve form destinations and submission APIs, HIPAA/privacy safeguards, consent/analytics, Google Ads conversion tracking and each production integration's activation. No new PHI flow is authorized.
  • Hosting/release: separately verify Contabo/NixOS deployment assumptions, HTTPS, canonical host, slashless URLs, query preservation, redirect targets and loops, real 404 responses, asset delivery, sitemap/robots, reproducible deployment, rollback and organizational release approval. The temporary Docker/nginx trailing-slash HTTPS-to-HTTP-to-HTTPS chain remains explicitly deferred. Static-build success does not verify these deployed behaviors.

Next: Phase 8 — Visual and Accessibility Acceptance

Begin from the signed Phase 7 SHA the user supplies; verify branch, history and working tree. Use the verification plan for full-page 1440px/approximately 390px review, keyboard/focus, no-JavaScript, Spanish forms/privacy, language fallback/navigation, Arabic RTL/diagrams and real screen-reader sessions. Record reviewer, date, device, evidence and failures. Use an approved local environment first with synthetic data and controlled network requests. Do not deploy a hosted preview before API isolation and appropriate authorization. No Phase 8 acceptance is implied by this checkpoint.

Phase 9 keeps all ten stakeholder decisions pending, including portal/landing ownership, form/API/privacy, analytics/advertising, clinical claims, policy provenance, author SEO, hosting and launch authorization. Phase 10 covers final QA/cutover readiness. Neither a browser pass nor technical translation approval clears production gates. Do not renumber the roadmap or begin production changes.

Working protocol and protected local files

Preserve the Markdown-first manifest-driven architecture, explicit translation relationships and ratified publication policies. Implement only authorized scope; report evidence and structural diffs before the user stages or commits. Follow AUTONOMOUS-CODEX.md; do not repair identity/signing or bypass sandbox restrictions.

Do not read, modify, move, delete, stage or checksum root merge-plan.md. Preserve and exclude these four superseded reconciliation reports without reading or modifying their contents:

  • www/reports/route-reconciliation-2026-10-11-offline.json
  • www/reports/route-reconciliation-2026-10-12-offline.json
  • www/reports/route-reconciliation-2026-10-13-offline.json
  • www/reports/route-reconciliation-2026-10-13-offline-06-16-06-857Z.json

Exclude root merge-plan.md and temporary .phase7-stage-paths.nul as well. The staging aid is for the user's host terminal only; never stage it or use a broad Git add. The actual future checkpoint SHA comes from Git after the user signs; do not amend merely to insert it here.