Files
aia-website/www/reports/phase-10-technical-readiness-package-2026-10-22.md
T

5.1 KiB

Phase 10 — Technical Readiness Package

Date: 2026-10-22 UTC Status: Technical handoff prepared; production gates remain open.

Acceptance matrix

Area Evidence Result Human/owner gate
Astro type/check npm run check Pass, 130 files, 0 diagnostics None for local build
Content/publication Markdown 20, publication 33, SEO 35, Library 53, routes 10 Pass, 151 core tests Content/clinical approvals remain separate
Phase 8/campaign/P9 isolation Phase 8 5, campaign 11, P9 nonproduction 5 Pass Language, screen-reader and stakeholder review pending
Artifact integrity staging/indexing verifier Pass; 128/127 routes, staging 0/0 sitemap/hreflang Hosting owner verification pending
Browser all-route 128/128 opened Pass Non-Chromium and authorized visual review pending
Responsive 110/110 checks Pass Human visual acceptance pending
Release rehearsal Node loopback switch/rollback Pass nginx/Contabo rehearsal pending
Link/image/blog audits all three audits Pass, zero findings None for local audit
Offline reconciliation explicit 2026-10-22 evidence check Pass; no fresh production crawl Source freshness remains qualified
Screen reader no real session in this environment Pending Authorized AT reviewer

Reproducible validation commands

From www:

TMPDIR=/tmp npm run check
npm run test:markdown
npm run test:publication
npm run test:seo
npm run test:library
npm run test:routes
node --test tools/phase8.test.mjs
node --test tools/campaign.test.mjs
node --test tools/phase9-nonproduction.test.mjs
node --test tools/phase10-artifact.test.mjs
npm run build
PUBLIC_ALLOW_INDEXING=true npm run build
npm run audit:links
npm run audit:images
npm run audit:blog
node tools/phase10-artifact-verify.mjs --mode=staging
node tools/phase10-release-rehearsal.mjs

The final normal staging build was restored after the indexing build. The explicit offline route reconciliation reports/route-reconciliation-2026-10-22-offline-05-10-47-827Z.json passed its read-only consistency check using saved request evidence; no unrestricted crawl occurred.

Phase 10 cutover prerequisites

  1. Record a locked Node/npm/toolchain and reproducible artifact manifest.
  2. Obtain sanitized Contabo/NixOS/nginx/TLS/DNS/Cloudflare facts.
  3. Verify host-local serving, canonical host, redirects, 404s, cache headers and rollback on an approved staging host.
  4. Form A has owner-reported functional acceptance and a local production gate, but still needs exact release-environment review, all-seven-route accessibility acceptance, runtime telemetry/privacy review, marketing-recipient operational review and no-deployment static-artifact verification. Its owner-reported configured consultation context is limited to nine isolated-test-only placements and remains outside the production resolver; physical Form B is retired; Form C remains unimplemented. Use Form A only when all four explicit build settings are approved: PUBLIC_AIA_FORMS_MODE=live, PUBLIC_AIA_FORMS_LIVE_APPROVED=true, PUBLIC_AIA_FORMS_ENVIRONMENT=production, and PUBLIC_AIA_FORM_A_PRODUCTION_APPROVED=true. PUBLIC_ALLOW_INDEXING=true is publication behavior only.
  5. Obtain P9-04 counter origin/credential/consent approval before a live adapter.
  6. Resolve P9-05 analytics/advertising measurement and P9-07 privacy/legal approval.
  7. Obtain P9-06 clinical/organizational and fluent-language approvals, including Arabic diagrams and Spanish HSA/FSA claims.
  8. Complete real screen-reader and authorized visual/non-Chromium acceptance.
  9. Name release/rollback owners and record backup/monitoring readiness.
  10. Obtain P9-10 go/no-go authorization; then run Phase 10 cutover and post-cutover smoke checks.

Decision status

P9-01 through P9-10 remain Pending decision. No technical feasibility result in this package is an approval. Jotform, counters, analytics, advertising, forms, employee portal, redirects and hosting remain inactive.

Keep the existing Phase 9 implementation, audit tooling and reports as one owner-reviewed technical batch. If a signed checkpoint is requested, stage exact paths only after reviewing the final status and reports. Keep any subsequent host rehearsal, Jotform configuration, counter live adapter and measurement work in separately authorized commits.

2026-10-30 portal and secrets preparation addendum

The local portal compatibility implementation does not close P9-02 or P9-09. The owner must supply legitimate codes privately to collect and classify legacy resources, accept the two decrypted views, approve delivery per resource and verify server-side staff/management separation. SOPS preparation is an inactive module and operational guide, not deployed infrastructure. Real age recipients, host topology, access policy, recovery and runtime key provisioning remain pending. Do not copy private/ into a release. The artifact verifier now rejects private resource paths and portal ciphertext from release artifacts. A local ciphertext preview is deliberately not a releasable artifact. No site cutover authorization is implied.