Files
aia-website/www/reports/phase-8-checkpoint-manifest-2026-10-15.md

18 KiB
Raw Permalink Blame History

Phase 8 checkpoint manifest and final validation — 2026-10-15 UTC

READY FOR USER-SIGNED PHASE 8 COMMIT

Technical checkpoint preparation only. No human accessibility, language, financial, clinical, legal/privacy or production approval is asserted. All P9-01–P9-10 remain Pending decision. No staging, signing, push, deployment or integration activation was performed. This document is the exact path authority for user staging.

Starting state and inventory reconciliation

Branch faithful-astro-migration; HEAD 8e64d322092b1fa6e0f648ddf26a665c80588198. Index empty. No loopback preview process remained; the user's ordinary Chromium and MCP service were not disturbed. No old Phase 7 staging aid exists.

Actual starting inventory: 27 modified tracked + 1 tracked deletion + 34 untracked = 62 paths, including the five protected exclusions. Thus 57 intended Phase 8 paths, not the earlier 55 estimate. The two additions since that estimate are phase-8-badge-correction-evidence-2026-10-15.json and the 18-21-22-820Z offline report. They document the subsequently authorized badge correction. No unexplained path or commit appeared. Preparing the handoff and this manifest adds two paths: 59 approved = 28 modified + 1 deleted + 30 added (rename detection disabled). The temporary staging aid is a 60th non-checkpoint working path, not an addition to the approved set. With exclusions and aid, final status contains 65 paths.

Only documentation changed during this preparation. Application, tooling, test, asset and historical JSON evidence bytes remain unchanged from preparation start. All original Phase 8 changes were retained. No protected contents were inspected, hashed or modified. Earlier Phase 8 route reports are included as historical implementation evidence; only the 18:21 artifact matches the current source. The four specifically excluded October 11–13 reports remain outside this scope.

Reviewed cumulative implementation

  • Contrast and persistent underlines for prose/FAQ/contact/form links; focus for navigation, language menu, skip link, cards, byline and Arabic diagram regions.
  • Source-layout-preserving director-grid correction at 320px.
  • Explicit Arabic article UI messages and number/title bidi isolation; existing English/Spanish behavior and the likes/views script are unchanged.
  • DTT/NET peer H2 sections and consultation Start Here H2, with original words, fragments and H3 visual size. No numerical-skip-only WCAG conclusion.
  • Native service dialogs preserved. Four Chromium scenarios and a minimal native control reproduced the browser-chrome boundary without application background focus escape; visible-browser/real-AT acceptance remains open.
  • Spanish HSA/FSA localization carryover, one section after ESA/before Financial Help. APROBADO asset is 500×425 RGBA, identical alpha to original and identical color pixels outside its 192×42 lettering rectangle at (154,188). Original EN homepage/image remain byte-identical to HEAD. Financial/fluent review pending.
  • Spanish privacy collection heading restored: eleven H2s and four list items. Removing the added heading/whitespace reproduces the previous policy exactly; date, frontmatter, links, contact and legal wording are preserved.
  • Complete Tour .md → .mdx pair below: one route, identical metadata, nine ordered source photos/captions, controls/thumbnails, focus, restrained live announcements, no rotation/animation, full no-JS fallback, consultation CTA.
  • Existing optional local browser environment, guarded browser scripts, focused tests and evidence are included. No package upgrade, new production API, backend, advertising, publication-policy or hosting change.

Evidence reviewed without repeating completed browser runs

Evidence population Recorded result Checkpoint evidence check
Initial system Chromium run 122 unique routes, 50 desktop + 50 mobile full-page captures, 50 no-JS routes, 40 passing interactions + one native-dialog review 100 representative capture hashes present and matching
Bounded follow-up 30 grouped checks, four native-dialog scenarios, seven actual-200%-zoom routes, Arabic diagram checks All 194 referenced capture hashes match; includes historical/superseded zoom frames
Consolidated follow-up Five distinct routes, 21 grouped checks, two contrast/reduced-motion probes, 20 full-page captures, two 200%-zoom routes/26 overlapping frames, four element crops All 50 referenced hashes match
Badge correction EN/ES at 320/390/768/1440, eight passing checks and eight section captures All eight hashes match; current asset hash matches
Real screen reader / authorized reviewer sign-off Zero sessions / no sign-offs supplied Pending; not inferred from automation

Playwright 1.61.0 / Chromium 151.0.7922.75, DPR 1 except documented native zoom. Counts are separate runs/populations, not additive unique routes or human approvals. Screenshots remain under their recorded /tmp paths, outside Git; they are available now but not guaranteed durable. No capture was recreated to satisfy a reference. Source evidence and summaries, not browser profiles/cookies, are included.

Network guards allowed exact loopback GET/HEAD only, denied external origins, WebSockets and website service workers. Earlier map requests and the isolated synthetic fixture POST were blocked and recorded as attempts. No production API/like/form/advertising/authentication interaction was transmitted. No new browser session or public retrieval was needed for checkpoint preparation.

Tour public evidence: ordinary TLS validation succeeded, HTTP 200, cache HIT with October 3 prerender observed October 15. Spanish privacy: cache-qualified capture after failed TLS validation and certificate-insecure fallback. Neither proves current origin freshness; Spanish additionally lacks authenticated provenance. Trusted Spanish-source comparison, legal/privacy and fluent review remain mandatory. No insecure retrieval or new production crawl was performed.

Final validation (sequential, October 15)

Environment: Node 24.18.0, npm 11.16.0, Astro 7.1.5, Linux/Nix. TMPDIR=/tmp ASTRO_TELEMETRY_DISABLED=1 used for the established environment; no application workaround or dependency change. Logs: /tmp/aia-p8-checkpoint/.

Command from www Actual result
npm run check 101 files, 0 errors/warnings/hints
npm run test:markdown 20 pass, 0 fail
npm run test:publication 33 pass, 0 fail
npm run test:seo 35 pass, 0 fail
npm run test:library 53 pass, 0 fail
npm run test:routes 10 pass, 0 fail
node --test tools/phase8.test.mjs 5 pass, 0 fail
Regression total 156 pass, 0 fail
npm run build Pass, 122 routes
PUBLIC_ALLOW_INDEXING=true npm run build Pass, 122 routes
npm run audit:links 0 broken internal links
npm run audit:images 0 missing mapped images
npm run audit:blog 0 content audit failures
Final npm run build (normal staging) Pass, 122 routes, last completed build
node --experimental-strip-types tools/audit-phase8.mjs /tmp/aia-p8-checkpoint/static.json 122 routes, 0 failures/review findings
Explicit offline consistency check (below) Pass, no network/writes
git diff --check Pass

No unexpected validation failure or source correction was required in this pass. Library coverage directly checks HSA section order/assets, eleven privacy headings, collection list, Arabic names/bidi, Tour inventory/one route and semantic headings. Content comparison confirms unchanged privacy wording, Tour metadata and original EN homepage/artwork; API script, redirects and P9 register are byte-identical to HEAD.

Invariant Signed Phase 7 → final Phase 8
HTML / unique canonicals 122/122 → 122/122
Indexing sitemap 108 → 108
Hreflang links / routes 180/55 → 180/55
Validated translation sets 25 → 25
Library / locale search records 74; 55/12/7 → unchanged
Author archives / redirect definitions 9/9 → 9/9
Library visible/schema FAQ answers / articles 182/30 → 182/30
Both English page-6 routes Five cards each
Tour / Arabic homepage One Tour; Arabic home unpublished
Final staging 122 noindex,nofollow; sitemap 0; hreflang 0

Raw all-site FAQ totals include non-Library pages and are not the Library 182/30 metric. Syndicated canonicals, noindex author archives, metadata-only search, translation graph, pagination and original publication dates remain intact.

Final explicit source-matching evidence: route-reconciliation-2026-10-15-offline-18-21-22-820Z.json. Fingerprint: 8453ffad597e2f2414343b634997bf204cbdd59fc00c3d8d122babef8a632cb5. Schema 2, 133 dispositions, 70 historical requests, 122 local routes. Historical production sitemap 102 is not the current indexing-enabled sitemap 108. After the final staging build:

npm run audit:routes -- --check --evidence reports/route-reconciliation-2026-10-15-offline-18-21-22-820Z.json

Passed; no redundant report generated for documentation-only changes.

Handoff and documentation disposition

SESSION_HANDOFF.md identifies Phase 8 as technically completed for checkpoint purposes, signed Phase 7 as the previous checkpoint, and the future checkpoint as the commit containing the update (no invented SHA). It preserves Phase 6C/7 history, source qualifications, final metrics and all release gates. Next: Phase 9 decision review/evidence gathering; no automatic integration implementation. Phase 10 retains final QA, rollback and cutover authorization.

Dated current-status pointers were added to Phase 8 acceptance, browser, consolidated and accessibility reports; migration-summary gains current orientation and this preparation record. Historical failures, original file/test counts and badge-generation evidence were retained. Host-browser instructions now acknowledge corrected headings and technical readiness while keeping human review pending. No historical JSON/source evidence was overwritten.

Exact approved paths

M = modified tracked; D = tracked deletion; A = currently untracked addition. Each row is a literal repository-relative Git path. This table is machine-readable by the verification procedure below. The two Tour paths deliberately count separately.

Status Path
M AUTONOMOUS-CODEX.md
M flake.nix
M www/README.md
A www/public/assets/images/hsa-fsa-accepted-es.png
M www/reports/SESSION_HANDOFF.md
M www/reports/accessibility-audit.md
M www/reports/migration-summary.md
A www/reports/phase-8-badge-correction-evidence-2026-10-15.json
A www/reports/phase-8-browser-evidence-2026-10-15.json
A www/reports/phase-8-browser-verification-2026-10-15.md
A www/reports/phase-8-checkpoint-manifest-2026-10-15.md
A www/reports/phase-8-consolidated-evidence-2026-10-15.json
A www/reports/phase-8-consolidated-followup-2026-10-15.md
A www/reports/phase-8-consolidated-source-evidence-2026-10-15.json
A www/reports/phase-8-followup-evidence-2026-10-15.json
A www/reports/phase-8-host-browser-verification-2026-10-14.md
A www/reports/phase-8-static-evidence-2026-10-14.json
A www/reports/phase-8-visual-accessibility-acceptance-2026-10-14.md
A www/reports/route-reconciliation-2026-10-14-offline-07-32-07-044Z.json
A www/reports/route-reconciliation-2026-10-15-offline-05-28-09-425Z.json
A www/reports/route-reconciliation-2026-10-15-offline-06-41-27-766Z.json
A www/reports/route-reconciliation-2026-10-15-offline-17-31-09-013Z.json
A www/reports/route-reconciliation-2026-10-15-offline-17-41-40-404Z.json
A www/reports/route-reconciliation-2026-10-15-offline-18-21-22-820Z.json
A www/reports/route-reconciliation-2026-10-15-offline.json
M www/src/components/BlogCard.astro
M www/src/components/BlogPostFooter.astro
M www/src/components/ContactForm.astro
M www/src/components/FAQAccordion.astro
A www/src/components/ImageCarousel.astro
M www/src/components/LanguageSwitcher.astro
M www/src/components/LikeViewCounter.astro
M www/src/components/MainNav.astro
M www/src/components/MobileNav.astro
M www/src/components/home/HomeDirector.astro
M www/src/components/pages/ContactPage.astro
M www/src/content/blog/en/aba-therapy-dtt-net-guide.md
M www/src/content/pages/en/schedule-consultation.mdx
D www/src/content/pages/en/tour.md
A www/src/content/pages/en/tour.mdx
M www/src/content/pages/es/index.md
M www/src/content/pages/es/privacy-policy.mdx
A www/src/data/tour-gallery.json
M www/src/layouts/BlogPostLayout.astro
M www/src/styles/blog.css
M www/src/styles/components.css
M www/src/styles/forms.css
M www/src/styles/layout.css
M www/src/styles/typography.css
A www/src/utils/article-messages.ts
A www/tools/audit-phase8.mjs
M www/tools/library.test.mjs
A www/tools/phase8-browser.mjs
A www/tools/phase8-consolidated.mjs
A www/tools/phase8-followup.mjs
A www/tools/phase8-interactions.mjs
A www/tools/phase8.test.mjs
A www/tools/playwright-smoke.mjs
M www/tools/seo.test.mjs

Exact exclusions and local-only artifacts

Never inspect, stage or delete the five protected/excluded files:

  • merge-plan.md
  • www/reports/route-reconciliation-2026-10-11-offline.json
  • www/reports/route-reconciliation-2026-10-12-offline.json
  • www/reports/route-reconciliation-2026-10-13-offline.json
  • www/reports/route-reconciliation-2026-10-13-offline-06-16-06-857Z.json

.phase8-stage-paths.nul is a sixth excluded working file created solely as the user's temporary staging aid. It contains 59 unique NUL-separated entries, each prefixed :(top,literal), exactly matching the table. It excludes itself. The old .phase7-stage-paths.nul is absent. No dist, caches, profiles, private environment files, patient data or unrelated paths are approved. All five original exclusions remain untouched and untracked. Index remains empty.

User-controlled staging and signing

From the repository root, first verify branch/HEAD/status and an empty index:

git branch --show-current
git rev-parse HEAD
git status --short --untracked-files=all
git diff --cached --name-only

Expected branch faithful-astro-migration, HEAD 8e64d322092b1fa6e0f648ddf26a665c80588198. Stop on any unexplained change.

git add --pathspec-from-file=.phase8-stage-paths.nul --pathspec-file-nul
git diff --cached --check
git diff --cached --stat --no-renames
git diff --cached --name-status --no-renames

Verify exact membership and change types, not just a count:

python3 - <<'PYVERIFY'
from pathlib import Path
import re, subprocess
rows = re.findall(r'^\| ([AMD]) \| `([^`]+)` \|$', Path('www/reports/phase-8-checkpoint-manifest-2026-10-15.md').read_text(), re.M)
expected = {p: s for s, p in rows}
raw = Path('.phase8-stage-paths.nul').read_bytes().split(b'\0')
assert raw.pop() == b''
prefix = b':(top,literal)'
assert all(x.startswith(prefix) for x in raw)
aid = [x[len(prefix):].decode() for x in raw]
assert len(rows) == len(expected) == len(aid) == len(set(aid)) == 59
assert set(aid) == set(expected)
parts = subprocess.check_output(['git','diff','--cached','--name-status','--no-renames','-z']).decode().split('\0')
assert parts.pop() == ''
staged = dict(zip(parts[1::2], parts[0::2]))
assert staged == expected, {'missing': sorted(set(expected)-set(staged)), 'extra': sorted(set(staged)-set(expected)), 'wrong_status': [p for p in expected.keys() & staged.keys() if expected[p] != staged[p]]}
print('Exact 59-path staged manifest, change types and literal staging aid match.')
PYVERIFY

Only after reviewing the diff and successful membership validation, run in the normal host terminal (Codex does not run these commands):

git commit -S -m "fix(a11y): reconcile responsive layouts and multilingual UI"
git log -1 --show-signature
git verify-commit HEAD
git rev-parse HEAD HEAD^
git show --format= --name-status --no-renames HEAD
git status --short --untracked-files=all

The new parent must be 8e64d322092b1fa6e0f648ddf26a665c80588198. Confirm 59 committed paths with renames disabled and no unexpected tracked changes. Expected remaining untracked paths: five exclusions plus the temporary staging aid. The user may remove only the aid after verifying the commit. Do not push automatically, amend to insert the SHA, or alter signing configuration to bypass a signing failure.

Remaining acceptance and next session

Pending: real screen reader, authorized full-page visual/source comparison, non-Chromium acceptance, fluent Spanish/Arabic (including controls/credentials), Arabic diagram clinical/language acceptance, HSA/FSA financial claims, general clinical/organizational/program eligibility, both policies' privacy/legal approval, and authenticated Spanish-policy comparison. Recorded browser checks are not sign-off.

P9-01 landing-page ownership; P9-02 portal security; P9-03 forms/API/privacy; P9-04 likes/views isolation; P9-05 analytics/consent/advertising; P9-06 clinical and organizational claims; P9-07 policies/provenance; P9-08 author SEO; P9-09 hosting, TLS/routes/rollback; P9-10 production go/no-go: all Pending decision.

Phase 9 kickoff: verify the actual user-reported signed Phase 8 commit on faithful-astro-migration; read policy, handoff, this manifest and decision register; review P9-01–10 with supporting evidence, owner roles, dependencies and explicit acceptance criteria. Gather decisions, do not infer approvals or implement unresolved integrations. Preserve exclusions, human gates and Phase 10 cutover responsibilities. No staging, signing, push, deployment, live configuration or integration activation.